Village of Elk Grove Village Department of Public Works

Clearmont Pedestrian Bridge Replacement

Elk Grove Village, IL
Bridges & Structures
2020
Home

WBK Engineering, LLC (WBK) completed Phase I and Phase II engineering services for the replacement of the Clearmont Pedestrian Bridge over Salt Creek. The existing bridge is a vital pedestrian and cycling link in the community and is frequently impassable during storm events. Reconstruction of a new, two-span truss bridge and multi-use path will maintain local community access across Salt Creek and accommodate connectivity to future regional bicycle routes.

This project earned the 2024 Project of the Year Award (Transportation, Less than $5M) granted by the Chicago Metro Chapter and Suburban Branch of the American Public Works Association (APWA).

The proposed structure consists of a two-span (142’, 208’) prefabricated trusses measuring 15’-8” out-to-out trusses and 356’ back-to-back abutments. A 33’ overlook extends out on each side of the truss over the primary channel. A revised profile raises the bridge and pathway out of the floodplain to eliminate overtopping of the new structure.

WBK provided the following Phase I services:

  • Prepared grant applications for federal funding
  • Performed topographic surveys, wetland delineation, tree survey, and existing bridge inspection
  • Special Waste Screening and Preliminary Environmental Site Assessment (PESA)
  • Environmental Survey Request (ESR) and Wetland Impact Evaluation (WIE)
  • Horizontal alignment and vertical profile design of the proposed bicycle path to meet IDOT, FHWA and ADA requirements
  • Compensatory storage analysis
  • Coordinated permitting with the US Army Corps of Engineers and Illinois Department of Natural Resources – Office of Water Resources
  • Type, Size & Location (TS&L) Plans
  • Preliminary Bridge Design and Hydraulic Report
  • Project stakeholder, public utility, and public involvement coordination

Phase II engineering activities included:

  • Supplemental Topographic Survey
  • Utility, Permitting, and Environmental Coordination
  • Final Plans, Specifications, and Cost Estimates for Pedestrian Bridge and Multi-Use Path

Contact us

If you are interested in beginning a new project, you are a potential teaming partner, or you just want to chat about great architecture and engineering, please drop us a note in this form.

If you have an RFQ/RFP to submit for consideration, please email us at marketing@bodwegroup.com.

Bodwé Professional Services

415 E. Prairie Ronde St.
Dowagiac, Michigan 49047
Toll-Free: 877-649-0492
269-585-2270

Seven Generations Architecture + Engineering

600 E. Michigan Ave.
Ste. B
Kalamazoo, MI 49007
269-927-0144

3463 Magic Dr.
Ste. T15
San Antonio, TX 78229

The Steelhead Engineering Company

259 E. Michigan Ave.
Ste. 407
Kalamazoo, MI 49007
269-585-2255

WBK Engineering

116 W. Main St.
Ste. 201
St. Charles, IL 60174
630-443-7755

68 E. Michigan Ave.
Battle Creek, MI 49017

Blue Star Integrative Studio

320 S. Boston Ave.
Ste. 1710
Tulsa, OK 74103
918-359-5640

By submitting this form, you agree to our Terms of Use.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.